🔥The Trans-Australian Railway (TAR) Answers with location - Đề thi thật IELTS READING- Làm bài online format computer-based, kèm đáp án, dịch & giải thích từ vựng - cấu trúc ngữ pháp khó

· Đề thi thật IELTS Reading

IELTS TUTOR cung cấp The Trans-Australian Railway (TAR): Đề thi thật IELTS READING (IELTS Reading Recent Actual Test) - Làm bài online format computer-based, , kèm đáp án, dịch & giải thích từ vựng - cấu trúc ngữ pháp khó & GIẢI ĐÁP ÁN VỚI LOCATION

I. Kiến thức liên quan

II. Làm bài online (kéo xuống cuối bài blog để xem giải thích từ vựng & cấu trúc cụ thể hơn)

📩 MN AI CHƯA CÓ ĐÁP ÁN FORECAST QUÝ MỚI PART 1-2-3 NHẮN ZL 0905834420 IELTS TUTOR GỬI FREE HẾT NHA

III. The Trans-Australian Railway (TAR)​: Đề thi thật IELTS READING (IELTS Reading Recent Actual Test)

READING PASSAGE 1

The Trans-Australian Railway (TAR)

Up until the first part of the 20th century, communications across the Australian continent were relatively undeveloped. Perth, the capital of Western Australia, remained isolated from Australia's eastern states until the Trans-Australian Railway (TAR) was built across the arid area known as the Nullarbor (No Trees) Plain. During the 19th century, the only form of transport between the west coast and the eastern cities was a long and often rough sea voyage across the Great Australian Bight, while the first east-west crossing of the Nullarbor Plain on foot was achieved by the English explorer Edward Eyre and his indigenous Australian guide Wylie in 1841. In 1877 a telegraph line was built across the plain, and it was this man-made structure that a mining engineer called Arthur Richardson followed, when he set out in 1896 to be the first to ride a bicycle around the Australian continent.>> Form đăng kí giải đề thi thật IELTS 4 kĩ năng kèm bài giải bộ đề 100 đề PART 2 IELTS SPEAKING quý đang thi (update hàng tuần) từ IELTS TUTOR

The first railway in Western Australia had opened in 1871, and by 1896 there was a 313-mile line going eastwards through the inhospitable landscape as far as Kalgoorlie. This line was built alongside a pipeline carrying drinking water to the arid goldfields around Kalgoorlie. Meanwhile, in the south-east of the continent, a railway line from Port Augusta to Oodnadetta had opened in 1891. These early railways in both the east and the west were built to the narrow gauge of 3ft 6in.

In 1901, the self-governing colonies of Queensland, New South Wales, Victoria, Tasmania, South Australia and Western Australia got together to form a federation. One of the incentives held out to Western Australia to become a member had been the promise of a trans-continental railway linking Perth with the eastern cities. A survey of the route across the featureless Nullarbor Plain was completed in 1909, and construction started to join the two existing railways at each end in 1912. Despite the onset of the First World War, work progressed until the two lines finally converged, at a site in an area of desert, in 1917. The railway's claim to fame is that its route includes the longest stretch - 297 miles- of straight track in the world. Although the existing railways at each end had been built to the narrow gauge, the new 1,052 mile stretch was built to the standard gauge of 4ft 8in. These two breaks of gauge would mean a true trans-continental service did not exist until 1970. Water supplies for steam engines on the TAR route were non-existent, as the railway did not cross a permanent watercourse along its entire length. To overcome this, the TAR line's original chief engineer had requested diesel engines, but his request was not granted, so steam haulage had to be supported by extra water tankers carried on each train. Australian- built, diesel electric engines eventually replaced steam haulage in 1951.

As well as being an important freight route, the new line saw the introduction of the Trans Australian Express, a service which commenced running in 1917 to serve isolated communities and settlements along its route. For much of its long-running life, this twice- weekly train consisted solely of sleeping cars; seated accommodation was only included from 1981 until the service terminated ten years later. The route of the train was extended following the conversion to standard gauge of its narrow-gauge sections in 1970, but facing increased competition from air travel it last ran in June 1991.

One long-lived curiosity of the trans-Australian network was the Tea and Sugar Train, which also started running in 1917. The train brought to communities along the route not only the necessities for everyday life, but also a butcher's shop, medical facilities and a cinema. It last ran in 1996.

Despite the withdrawal of the Trans-Australian Express between Adelaide and Perth in 1991, the Indian Pacific service has operated between Sydney on the east coast and Perth since 1970, the year that the TAR route was completely converted to standard gauge. This service is operated by Great Southern Rail. It runs twice a week between Adelaide and Perth, and once a week between Sydney and Perth. The journey time for the complete 2,704-mile journey is 66% hours westbound and 71% 4 hours eastbound.>> tham khảo CẦN VIẾT & THU ÂM BAO NHIÊU BÀI ĐỂ ĐẠT 8.0 SPEAKING & 7.0 WRITING?

The Indian Pacific service calls by at the isolated outback railway settlements of Pimba, which has a population of around fifty, Kingoonya, which only has a hotel, and Tarcoola, which has a population of around forty and is a junction for the south-north line to Darwin. It then travels to Cook, which, despite having a population of fewer than ten, is a scheduled stop, before crossing the Nullarbor Plain in a dead straight line for 297 miles to Loongana, which is uninhabited and is a request stop, and Rawlinna, also a request stop serving Australia's largest sheep station. Civilisation is eventually reached at Kalgoorlie before the last leg of the journey westwards to East Perth Station. The train has carriages with seating, sleeping cars, a restaurant car, and wagons conveying passengers' motor cars.

Questions 1–5

Do the following statements agree with the information given in Reading Passage 1?
Write:

  • TRUE if the statement agrees with the information

  • FALSE if the statement contradicts the information

  • NOT GIVEN if there is no information on this

  1. Before the Trans-Australian Railway (TAR) was built, Perth had no transport links to eastern Australia.

  2. Edward Eyre and Wylie were the first to cross the Nullarbor Plain by bicycle.

  3. The first railway in Western Australia was constructed primarily to serve gold mining operations.

  4. The construction of the TAR was delayed due to the outbreak of the First World War.

  5. The TAR was the first railway in Australia to use standard gauge tracks.

Questions 6–9

Complete the notes below.
Choose NO MORE THAN TWO WORDS AND/OR A NUMBER from the passage for each answer.

Trans-Australian Railway (TAR) Key Facts

  • Longest straight track section: 6 ______ miles

  • Original gauge of eastern/western railways: 7 ______

  • Year diesel replaced steam engines: 8 ______

  • Final year of the Tea and Sugar Train: 9 ______

Questions 10–13

Label the diagram below.
Choose NO MORE THAN TWO WORDS from the passage for each answer.

Indian Pacific Service Route

  • Stops at 10 ______ (population ~50) and 11 ______ (only has a hotel).

  • Crosses the Nullarbor Plain in a straight line to 12 ______ (uninhabited request stop).

  • Ends at 13 ______ Station in Perth.

IV. Dịch bài đọc The Trans-Australian Railway (TAR)

The Trans-Australian Railway (TAR) Answers with location - Đề thi thật IELTS READING
The Trans-Australian Railway (TAR) Answers with location - Đề thi thật IELTS READING
The Trans-Australian Railway (TAR) Answers with location - Đề thi thật IELTS READING
The Trans-Australian Railway (TAR) Answers with location - Đề thi thật IELTS READING
The Trans-Australian Railway (TAR) Answers with location - Đề thi thật IELTS READING

V. Giải thích từ vựng The Trans-Australian Railway (TAR)

The Trans-Australian Railway (TAR) Answers with location - Đề thi thật IELTS READING
The Trans-Australian Railway (TAR) Answers with location - Đề thi thật IELTS READING

VI. Giải thích cấu trúc ngữ pháp khó The Trans-Australian Railway (TAR)

The Trans-Australian Railway (TAR) Answers with location - Đề thi thật IELTS READING
The Trans-Australian Railway (TAR) Answers with location - Đề thi thật IELTS READING

VII. Đáp án The Trans-Australian Railway (TAR)

Questions 1–5 (TRUE/FALSE/NOT GIVEN)

  1. FALSE – The text states that before the TAR, the only transport was a "long and often rough sea voyage" (not "no transport links").

  2. FALSE – Edward Eyre and Wylie crossed on foot; Arthur Richardson was the first cyclist (1896).

  3. NOT GIVEN – The 1871 railway is mentioned, but its purpose (gold mining or otherwise) isn’t specified.

  4. FALSE – Work "progressed despite the First World War" (no delay mentioned).

  5. FALSE – The TAR used standard gauge, but the text doesn’t claim it was the first in Australia.

Questions 6–9 (Note Completion)

  1. 297 (longest straight track)

  2. 3ft 6in (narrow gauge of early railways)

  3. 1951 (diesel replaced steam)

  4. 1996 (Tea and Sugar Train’s final year)

Questions 10–13 (Diagram Labelling)

  1. Pimba (population ~50)

  2. Kingoonya (only has a hotel)

  3. Loongana (uninhabited request stop)

  4. East Perth (final stop)

The Trans-Australian Railway (TAR) Answers with location - Đề thi thật IELTS READING
The Trans-Australian Railway (TAR) Answers with location - Đề thi thật IELTS READING

📩 MN AI CHƯA CÓ ĐÁP ÁN FORECAST QUÝ MỚI PART 1-2-3 NHẮN ZL 0905834420 IELTS TUTOR GỬI FREE HẾT NHA

Các khóa học IELTS online 1 kèm 1 - 100% cam kết đạt target 6.0 - 7.0 - 8.0 - Đảm bảo đầu ra - Thi không đạt, học lại FREE

Các khóa học IELTS online 1 kèm 1 - 100% cam kết đạt target 6.0 - 7.0 - 8.0 - Đảm bảo đầu ra - Thi không đạt, học lại FREE

>> Thành tích học sinh IELTS TUTOR với hàng ngàn feedback được cập nhật hàng ngày

Các khóa học IELTS online 1 kèm 1 - 100% cam kết đạt target 6.0 - 7.0 - 8.0 - Đảm bảo đầu ra - Thi không đạt, học lại FREE
Khóa học IELTS Reading
Lý do chọn IELTS TUTOR